hot links menu
Telcom Services

Central Office
bulletDesign Services
bulletGrounding Audits
bulletSoft Switch Studios
bulletFiber Optic Equipment Recommendation
bulletRacks and Patch Panels Installed 

Outside Plant
bulletRDUP(RUS) Designs
bulletRDUP(RUS) Loan Applications
bulletField Staking Services
bulletCAD Drafted Construction Drawings
bulletConstruction Supervision/Inspections
bulletPre-Bid and Bid Openings Conducted
bulletAs-Built Drawings Prepared
bulletCutover
bulletContract Closeout Documents Prepared

CAD Services
bulletAutoCAD™ and Bentley Microstation™
bulletESRI Software
bulletFocus™ for CATV
bulletLode Data for CATV
bulletOPTI for AT&T
bulletEWO-Telco for RDUP(RUS)
bulletTelco Specific Application Software

FTTx Module
bulletFTTN/FTTP Design Services
bulletRecommendations on Equipment
bulletField Staking Services
bulletConstruction Supervision
bulletCloseouts and Cutover

OSP Records Conversion
bulletOSP Field Inventory
bulletLandbase Preparation
bulletPaper Staking Sheet Conversion
bulletBacklog and Ongoing Posting to New Records

Joint Use Inventories
bulletField Inventory
bulletTelephone/Power/CATV
bulletGPS Data
bulletDigital Photography of Poles
bulletMake Ready Work

GPS Field Audit
bulletSub-Meter Accuracy Capable
bulletCurrent Technology Used
bulletOverlays onto GIS Maps or Aerial Photography

Splicing
bulletFiber Optic and Copper Splices
bulletFusion and Mechanical Splicing
bulletAll Fiber Optic Test Services

^ Back to Top